Caledonia Clean Energy Project Details
1. Key Information
Field | Information |
---|---|
Project ID | 98 |
Project Name | Caledonia Clean Energy Project |
Alternative Name | Captain Clean Energy Project |
Scale | Demonstration |
Purpose | Power |
Location | Grangemouth, Scotland |
Country | UK |
Continent | Europe |
Latitude | 56.026258 |
Longitude | -3.682977 |
Regulation Status | |
Primary Company / Alliance | Summit Power Group |
2. Further Information
Field | Information |
---|---|
Project Description | Original plan was for new-build IGCC coal power plant, based on the (now cancelled) Summit Power Texas Clean Energy Project design, with options for supply of syngas to nearby refinery. Now gas-fed options are being considered. Selection of configuration will depend on government and commercial interest. CO2 transport would re-use existing Feeder 10 gas pipeline to St Fergus. CO2 storage originally planned through EOR in North Sea, with saline formation storage as alternative, now likely to tie in with St Fergus hub development (see Acorn Project entry). Mar'15 - UK and Scottish Governments jointly fund GBP 4.2 million industrial research and feasibility studies. Autumn 2016 - initial feasibility study results presented to government but not published. Project led study setting out financial value of CCS to UK as a whole, published Oct'17.June 2018, Feasibilty study summary report published. Four technology options considered: CCGT with post-combustion capture; SMR for hydrogen supply or power generation; two pressurised oxy-gas systems, either CapSol (ex Sargas) or NET Power Allam cycle. Grangemouth and CCEP are included in the ACT ALIGN Project, which will produce blueprints for decarbonising six industrial regions in Europe.(Updated 11/06/18) |
Project Website | http://www.summitpower.com/projects/carbon-capture/ |
3. Status
Field | Information |
---|---|
Status | In Planning |
Status Comment | |
Intended Operational Year | 2018 |
Operation Year | |
End Operation Year | |
Date Comment | Now earliest 2023+ |
4. Funding
Field | Information |
---|---|
Estimated Cost | |
Public Funding | No |
Public Funding Comment | Reserve project in UK CCS commercialisation programme. Some support given for NER300 bid preparation. Anticipating support from Contract for Difference. GBP 4.2 million awarded from UKGov for research and feasibility studies. |
Public Engagement | Local opposition to new energy projects in Grangemouth, centered on Forth Energy biomass plant but extending to Caledonia project. |
5. Organisation
Field | Information |
---|---|
Non Commercial Org | |
CCS Group | |
Company Comment | Partners National Grid, CO2Deepstore |
6. Storage
Field | Information |
---|---|
Fate | Unknown |
On / Offshore | Offshore |
Storage Company | CO2Deepstore |
Injection (MT CO2/yr) | 3.0 |
Total Injection (MT CO2) | |
Storage Distance | 358 km |
Storage Country | UK |
Storage Latitude | |
Storage Longitude | |
Storage Comment | Both aquifer and EOR storage options in Central North Sea considered |
Storage Monitoring |
7. Production
Field | Information |
---|---|
Product | Electricty and hydrogen |
Source Company | Summit Power |
Construction | New |
Permit | |
Permit Date | |
Feedstock | Gas |
Feedstock Detail | |
Feedstock Additional | |
Power Plant Size | |
Fuel Capacity | |
Production Capacity | |
Plant Capacity Comment | Up to 1381 MWe considered. |
8. Separation
Field | Information |
---|---|
Separation Type | Unknown |
Separation Technology | |
Separation Comment | Pre- and post-combustion, and oxy-gas considered |
Capture Company | |
CCS Capacity |
9. Transport
Field | Information |
---|---|
Transport Method | Pipe |
Transport Company | National Grid |
Cluster | Yes |
Cluster Comment | Share transport and compression facilities with St Fergus hub. Potential Grangemouth cluster. |
Trans-boundary | No |
Transport Comment | Proposing re-use of Feeder 10 high-pressure gas pipeline, gas phase transport due to pressure constraints. |
10. Edit History
Field | Information |
---|---|
Date Entered | 2012-03-20 14:10:08 |
Entered by | CCSDBA |
Date Modified | 2021-10-22 10:27:42.115191 |
Modified by | rsteven2 |
Links
http://www.ccsassociation.org/news-and-events/reports-and-publications/clean-air-clean-industry-clean-growth/ |
Report on value of CCS to UK (Oct 2017). |
http://www.alignccus.eu/about-project |
ACT ALIGN Project website |
https://summitpower.com/wp-content/uploads/2018/06/CCEP-Feasibilility-Final-Report-MAY-2018-SUMMARY-VERSION.pdf |
Report (June 2018): Feasibility study report summary. |
https://www.gasworld.com/report-hints-at-co2-capture-potential/2014910.article |
Press (June 2018): Article reporting feasibility study. |