Al Reyadah Details

1. Key Information

FieldInformation
Project ID622
Project NameAl Reyadah
Alternative NameEmirates Steel Industries (ESI) CCS Project, Abu Dhabi CCS Project
ScaleCommercial
PurposeIndustry
LocationMussafah, Abu Dhabi
CountryUnited Arab Emirates
ContinentMiddle East
Latitude24.323899
Longitude54.468958
Regulation Status
Primary Company / AllianceMasdar, ADNOC and Emirates Steel Industries

2. Further Information

FieldInformation
Project DescriptionThe first and currently (2021) only fully commercial CCS facility for the iron and steel industry globally. CO2 is captured from a Direct Reduced Iron (DRI) plant, using traditional MEA abrorption/recovery system as part of reducing gas recycle leading to CO2 rich (>99%) waste stream, and dehydrated and compressed for distribution for EOR. Engineering Procurement and Construction contract awarded to Dodsal in Sept 2013 with Tebodin contracted for the detailed engineering design. Project in construction by Feb 2014, complete and being commissioned in Q3'16. Formal project launch Nov. 2016. Dec'17 - other industrial CO2 sources in region being assessed for potential capture. Jan'18, ADNOC buy out Masdar share of joint venture to take full ownership. The project has been captuirng 0.8MtCO2/yr since launching in 2016.
Project Websitehttps://www.adnoc.ae/en/sustainability-net-zero/decarbonizing-our-operations/carbon-capture-utilization-and-storage

3. Status

FieldInformation
StatusOperational
Status CommentFEED Study Completed 2010. In construction, early 2014. Formal opening Nov.2016
Intended Operational Year2015
Operation Year2016
End Operation Year
Date CommentCommissioning second half 2016, launched Nov. 2016

4. Funding

FieldInformation
Estimated Cost
Public FundingYes
Public Funding CommentSeed capital (USD 15 billion) for Masdar city project provided by government of Abu Dhabi.
Public Engagement

5. Organisation

FieldInformation
Non Commercial Org
CCS Group
Company CommentAl Reyadah was a joint venture of ADNOC and Masdar (a.k.a. Abu Dhabi Future Energy Company), ADNOC bought out Masdar share in January 2018

6. Storage

FieldInformation
FateEOR
On / OffshoreOnshore
Storage CompanyADCO, subsiduary of ADNOC
Injection (MT CO2/yr)0.8
Total Injection (MT CO2)
Storage Distance43km
Storage CountryUnited Arab Emirates
Storage Latitude
Storage Longitude
Storage CommentEOR in ADCO-operated Rumaitha and Bab onshore oilfields
Storage Monitoring

7. Production

FieldInformation
ProductSteel
Source CompanyEmirates Steel Industries
ConstructionRetrofit
Permit
Permit Date
FeedstockGas
Feedstock Detail
Feedstock Additional
Power Plant Size
Fuel Capacity
Production Capacity
Plant Capacity Comment3.2 Mtpa steel

8. Separation

FieldInformation
Separation TypePost-combustion
Separation TechnologyAmine
Separation Comment
Capture Company
CCS Capacity

9. Transport

FieldInformation
Transport MethodPipe
Transport CompanyMasdar Clean Energy
ClusterYes
Cluster CommentADNOC aims to expand its CCS operations to be capturing a total of 5MtCO2/yr by 2030, by adding the Shah gas plant (2.3Mt/yr) and the Habshan-Bab gas plant (1.9Mt/yr).
Trans-boundaryNo
Transport CommentPipeline (240bar) to onshore injection site 43 km distance. Part of planned 500km network.

10. Edit History

FieldInformation
Date Entered2013-10-28 12:15:22
Entered byCCSDBA
Date Modified2023-11-15 15:32:33.907142
Modified byrsteven2

Links