Drax BECCS Pilot Plant Details
1. Key Information
Field | Information |
---|---|
Project ID | 2261 |
Project Name | Drax BECCS Pilot Plant |
Alternative Name | |
Scale | Pilot |
Purpose | Power |
Location | Drax, near Selby |
Country | UK |
Continent | Europe |
Latitude | 53.735812 |
Longitude | -1.000275 |
Regulation Status | |
Primary Company / Alliance | Drax Power, Mitsubishi Heavy Industries, C-Capture |
2. Further Information
Field | Information |
---|---|
Project Description | Project to pilot CO2 capture from biomass combustion flue gas at Drax Power Station, firstly with C-Capture from 2018 and then with Mitsubishi Heavy Industries (MHI) from 2020. Following initial lab trials, a small (1t/day) C-Capture pilot plant in commissioning from Nov 2018, with full operation announced in Feb 2020. A second pilot facility was installed by MHI in late 2020, leading to a long-term contract for Drax to use MHI’s Advanced KM CDR processTM. Also in 2020, Worley and Shell were each awarded contracts for pre-FEED studies for the first two carbon capture units at Drax, each of which is expected to capture ~4MtCO2/yr. Environmental scoping and public consultations are taking place in 2021. (In June 2019, a FEED study for a further pilot project with FuelCell Energy was announced - see separate entry.) |
Project Website | https://www.drax.com/about-us/our-projects/bioenergy-carbon-capture-use-and-storage-beccs/ |
3. Status
Field | Information |
---|---|
Status | Pilot |
Status Comment | |
Intended Operational Year | |
Operation Year | 2018 |
End Operation Year | |
Date Comment |
4. Funding
Field | Information |
---|---|
Estimated Cost | GBP 400,000 for initial pilot trial |
Public Funding | Yes |
Public Funding Comment | C-Capture received GBP 5M from UK Gov for further development of its novel solvent system, including validation at TCM-Mongstad, extension of the pilot plant and design for scale-up. |
Public Engagement |
5. Organisation
Field | Information |
---|---|
Non Commercial Org | University of Leeds |
CCS Group | |
Company Comment | C-Capture is a UoLeeds spinout company |
6. Storage
Field | Information |
---|---|
Fate | No storage |
On / Offshore | Unknown |
Storage Company | |
Injection (MT CO2/yr) | 8.0 |
Total Injection (MT CO2) | |
Storage Distance | |
Storage Country | |
Storage Latitude | |
Storage Longitude | |
Storage Comment | Up to 8MtCO2/yr could be stored under the Southern North Sea as part of the Zero Carbon Humber cluster project |
Storage Monitoring |
7. Production
Field | Information |
---|---|
Product | Electricity |
Source Company | Drax Power Ltd |
Construction | Retrofit |
Permit | |
Permit Date | |
Feedstock | Other |
Feedstock Detail | Biomass, mostly imported pellet |
Feedstock Additional | |
Power Plant Size | 3960 |
Fuel Capacity | |
Production Capacity | |
Plant Capacity Comment |
8. Separation
Field | Information |
---|---|
Separation Type | Post-combustion |
Separation Technology | |
Separation Comment | Phase 1: novel solvent absorption system; Phase 2: Advanced KM CDR Process using KS-21 solvent |
Capture Company | Phase 1: C-Capture; Phase 2: Mitsubishi Heavy Industries |
CCS Capacity |
9. Transport
Field | Information |
---|---|
Transport Method | Unknown |
Transport Company | |
Cluster | Yes |
Cluster Comment | Drax is one of the key anchor projects for the Zero Carbon Humber cluster project, and the overarching East Coast Cluster |
Trans-boundary | No |
Transport Comment |
10. Edit History
Field | Information |
---|---|
Date Entered | 2018-06-08 15:07:40 |
Entered by | CCSDBA |
Date Modified | 2021-11-02 21:17:08.927773 |
Modified by | rsteven2 |